Core Leça

Core Leça

Commercialization | Under construction

The last opportunities: Terrace T4 and T3

Two four-bedroom apartments with a terrace and one three-bedroom apartment for families looking to live in Leça da Palmeira

With around 95% of the apartments alread sold and construction at an advanced stage, CORE Leça is approaching completion, scheduled for the fourth quarter of 2026.

The four-bedroom apartaments with a terrace stand out for their spacious south-facing outdoor areas, extending the living room and maximising natural light throughout the day. Fully equipped, these apartments include air conditioning, two parking spaces, and features designed to ensure everyday comfort and functionality.

The remaining three-bedroom apartment retains the essence of the CORE concept: functional, flexible and adaptable to different stages of life. The kitchen includes all of the essentials and pre-installation for additional appliances, allowing the space to be personalizaed over time.

Features

3 apartments
  • Parking
  • Condominium room
  • Terrace (T4)
  • Photovoltaic panels for self-consumption in the apartments
  • Pre Energetic Certification A/A+
Map of finishes Map of Finishes T3

Location

20 minutes from Porto and an 8-minute walk from the centre of Leça da Palmeira

CORE Leça is located in a quiet area with easy access to the city center of Porto. 8 minutes walk from the center of Leça da Palmeira and just a bridge away from Matosinhos.

To live in Leça da Palmeira is to choose a quality of life. Leça is a destination increasingly sought after for its authenticity. It combines history, architecture, nature and a youthful spirit.

Availabilities

Showing {{ unidades_list.length }} of {{ total }}
, filtered by
No apartments available at the moment.
No apartments available at the moment.

Construction

September 2026

Work on common areas and outdoor landscaping | Preparations for the completion of the apartments

June 2026

Painting, tiling, vinyl flooring and joinery work

June 2026

Completion of the installation of the prefabricated reinforced concrete façade

March 2026

Assembly of prefabricated reinforced concrete façade, window frames and balcony railings | Construction of interior plasterboard walls

January 2026

Assembly of the prefabricated façade

November 2025

Preparation for concreting floor 9 | Start of installation of the prefabricated facade

September 2025

Concreting the floor 4 slab

June 2025

Concreting the floor 0 slab

March 2025

Foundation concreting begins

November 2024

Start of excavation work and site assembly

Request Info

Please contact our team if you would like to receive more information about this project.

I'm interested in the typologies (optional)