Core Leça

Core Leça

Commercialization | Under construction

Nwe Units Launch: Terraces T3 and T4

On the top floor of CORE Leça, there are 4 exclusive 3- and 4-bedroom apartments, each with a unique terrace.

These apartments stand out for their spacious south-facing terraces, which extend the living area and maximise natural light throughout the day. Fully equipped, they include air conditioning, 2 parking spaces and features that ensure comfort and functionality in everyday life.

Inside, the kitchens are fully equipped, and all bedrooms have fitted wardrobes, ensuring organisation and efficient use of space. One of the parking spaces includes a charging system for electric vehicles.

The Essential has evolved where comfort and quality meet.

The Project

Inspired by the Essential Living concept, CORE Leça proposes a new way of living: simpler, more mindful and focused on the essentials. A project designed to offer quality, functionality and adaptability, where every space is designed to meet the real needs of everyday life.

Located in Leça da Palmeira, CORE Leça comprises 102 apartments, with 95% of the units currently sold. The project is at an advanced stage of construction, with the façade already completed.

Features

4 apartments
  • Spacious terraces, south-facing
  • 2 Parking Spaces
  • Wardrobes em todos os quartos
  • Equipped kitchens: cabinets and appliances
  • Air conditioning
  • Electric vehicle chargers
  • Condominium room
  • Photovoltaic panels for self-consumption in the apartments
Map of finishes Payment conditions

Location

20 minutes from Porto and an 8-minute walk from the centre of Leça da Palmeira

CORE Leça is located in a quiet area with easy access to the city center of Porto. 8 minutes walk from the center of Leça da Palmeira and just a bridge away from Matosinhos.

To live in Leça da Palmeira is to choose a quality of life. Leça is a destination increasingly sought after for its authenticity. It combines history, architecture, nature and a youthful spirit.

Availabilities

Showing {{ unidades_list.length }} of {{ total }}
, filtered by
No apartments available at the moment.
No apartments available at the moment.

Construction

March 2026

Assembly of prefabricated reinforced concrete façade, window frames and balcony railings | Construction of interior plasterboard walls

January 2026

Assembly of the prefabricated façade

November 2025

Preparation for concreting floor 9 | Start of installation of the prefabricated facade

September 2025

Concreting the floor 4 slab

June 2025

Concreting the floor 0 slab

March 2025

Foundation concreting begins

November 2024

Start of excavation work and site assembly

Request Info

Please contact our team if you would like to receive more information about this project.

I'm interested in the typologies (optional)